Take the pledge to vote

For a better tommorow#AajSawaroApnaKal
  • I agree to receive emails from News18

  • I promise to vote in this year's elections no matter what the odds are.
  • Please check above checkbox.

    SUBMIT

Thank you for
taking the pledge

Vote responsibly as each vote counts
and makes a diffrence

Disclaimer:

Issued in public interest by HDFC Life. HDFC Life Insurance Company Limited (Formerly HDFC Standard Life Insurance Company Limited) (“HDFC Life”). CIN: L65110MH2000PLC128245, IRDAI Reg. No. 101 . The name/letters "HDFC" in the name/logo of the company belongs to Housing Development Finance Corporation Limited ("HDFC Limited") and is used by HDFC Life under an agreement entered into with HDFC Limited. ARN EU/04/19/13618
CO-PRESENTED BY
LIVE TV DownloadNews18 App
News18 English
272
nda:
Needmore seats to Win
Needmore seats to Win
upa:
»
3-min read

Hyderabad throws open India's longest flyover

The 11.633-km long PVNR Expressway has been built at a cost of Rs 600 cr.

News18test sharma |

Updated:October 19, 2009, 11:42 PM IST
facebookTwittergoogleskypewhatsapp
Hyderabad throws open India's longest flyover
The 11.633-km long PVNR Expressway has been built at a cost of Rs 600 cr.
Loading...

Hyderabad: Access to the Rajiv Gandhi International Airport at Shamshabad, about 30 km from the city, has now become smoother and faster with India's longest flyover thrown open to traffic Monday.

The 11.633-km long PVNR Expressway, named after former Prime Minister P V Narasimha Rao, connects the Mehdipatnam area in the city to the Hyderabad-Bangalore National Highway (NH 7) en route to the international airport.

Built by Hyderabad Metropolitan Development Authority (HMDA) at a cost of Rs 600 crore, the 17.2-metre-wide four-lane elevated expressway starts at Sarojini Devi Eye Hospital at Mehdipatnam and lands at Aramghar Junction on NH 7 to join an underpass.

The airport-bound traffic will proceed further to get on to the Trumpet interchange, providing faster access to the airport.

HMDA officials say the facility would cut the travel time to the airport by 30 to 40 minutes. At present, it takes 45 minutes to an hour for a person to reach the airport from different points in the city.

Chief Minister K Rosaiah inaugurated the city's new landmark Monday evening and drove in a bus on the Expressway, which passes over some of the congested areas in the city and the outskirts.

However, the inaugural ceremony was not without controversies. There was a stampede as several ruling Congress party workers gatecrashed to get closer to the chief ministers and several state ministers who attended the ceremony.

Majlis-e-Ittehadul Muslimeen (MIM) President and Hyderabad MP Asaduddin Owaisi and state legislators of his party boycotted the inaugural ceremony to protest naming of the flyover after Narasima Rao.

MIM, the powerful Muslim political party in the city, and various other Muslim groups opposed naming the expressway after Narasimha Rao as they blame him for demolition of Babri Masjid at Ayodhya.

After the death of Rajasekhara Reddy in a helicopter crash on September 2, these groups demanded that the project be named after the late chief minister. However, the state government ignored their demand.

Work on the project was launched in 2005 when the foundation stone was laid for the new greenfield airport, and was completed a year-and-a-half after the airport launched commercial operations.

The PVNR Expressway, which encompasses 327 spans, was delayed due to various reasons, including financial constraints over the last one year.

It was last scheduled to be opened on October 2 but the inauguration was put off in view of the death of chief minister Y S Rajasekhara Reddy, who had laid the foundation stone for the project.

In a move aimed at ensuring fast and smooth traffic on the expressway, the Hyderabad and Cyberabad police have prohibited from it all two-wheelers, three-wheelers, all types of goods vehicles and slow-moving vehicles.

Since the down and up ramps are yet to be completed, the motorists will have to be careful while getting on to the expressway as they will not be able to get down before covering the entire distance. However, median gaps have been provided at three points as a temporary measure for emergency U-turns.

Officials said a speed of 100 km per hour was envisaged on the expressway but for light motor vehicles the speed limit will be 60 kmph. According to HMDA Chief Engineer Vivek Deshmukh, sound barriers were being installed at five points to reduce traffic noise pollution in residential and hospital zones.


(Get detailed and live results of each and every seat in the Lok Sabha elections and state Assembly elections in Andhra Pradesh, Odisha, Arunachal Pradesh and Sikkim to know which candidate/party is leading or trailing and to know who has won and who has lost and by what margin. Our one-of-its-kind Election Analytics Centre lets you don a psephologist’s hat and turn into an election expert. Know interesting facts and trivia about the elections and see our informative graphics. Elections = News18)
Read full article
Loading...
Next Story
Next Story

Also Watch

facebookTwittergoogleskypewhatsapp
 
 

Live TV

Loading...
Countdown To Elections Results
  • 01 d
  • 12 h
  • 38 m
  • 09 s
To Assembly Elections 2018 Results