Take the pledge to vote

For a better tommorow#AajSawaroApnaKal
  • I agree to receive emails from News18

  • I promise to vote in this year's elections no matter what the odds are.
  • Please check above checkbox.

    SUBMIT

Thank you for
taking the pledge

Vote responsibly as each vote counts
and makes a diffrence

Disclaimer:

Issued in public interest by HDFC Life. HDFC Life Insurance Company Limited (Formerly HDFC Standard Life Insurance Company Limited) (“HDFC Life”). CIN: L65110MH2000PLC128245, IRDAI Reg. No. 101 . The name/letters "HDFC" in the name/logo of the company belongs to Housing Development Finance Corporation Limited ("HDFC Limited") and is used by HDFC Life under an agreement entered into with HDFC Limited. ARN EU/04/19/13618
LIVE TV DownloadNews18 App
News18 English
News18 » India
1-min read

Narmada Bachao Activists End MP River Protest after 5 of 6 Demands Met

The protesters wanted the water level in the dam to be reduced from 196.6 metres to 193 metres.

PTI

Updated:November 5, 2019, 8:05 PM IST
facebookTwitter Pocket whatsapp
Narmada Bachao Activists End MP River Protest after 5 of 6 Demands Met
Activist Medha Patkar with others at the protest site on Sunday. (Credit: Twitter@Rehmat6)

Khandwa (MP): A protest by Narmada Bachao Andolan in Madhya Pradesh's Khandwa district for reduction in the water level in a dam ended on Tuesday after all but one of their demands were accepted.

NBA leader Alok Agarwal and others have been standing in waist-deep water in the Narmada river at Kamankheda village since October 25 demanding that water level in Omkareshwar Dam be brought down to save villagers living in its catchment areas.

The protesters wanted the water level in the dam to be reduced from 196.6 metres to 193 metres.

The 12-day 'Jal Satyagraha' ended after after Narmada Hydroelectric Development Corporation (NHDC) Chief General Manager Pawan Sharma gave a written assurance on five NBA demands on behalf of the state government, Agarwal said.

However, the sixth demand, of reducing the water level in the dam, was not accepted due to technical reasons, he added.

The NHDC had, on October 21, started increasing the water level in the dam, leading to villages in the catchment areas getting flooded.

He claimed a site will be developed to rehabilitate 500 families affected due to the construction of Omkareshwar Dam, and a package announced in 2013 for about 700 families will be doubled.

Get the best of News18 delivered to your inbox - subscribe to News18 Daybreak. Follow News18.com on Twitter, Instagram, Facebook, Telegram, TikTok and on YouTube, and stay in the know with what's happening in the world around you – in real time.

Read full article
Next Story
Next Story

facebookTwitter Pocket whatsapp

Live TV

Countdown To Elections Results
To Assembly Elections 2018 Results